API PLAN 75

Leakage of condensate from inboard seal of a dual containment seal is directed to a liquid collector.

In Piping Plan 75 there is a containment seal chamber leakage collection system for condensing or mixed phase leakage. This plan is used when pumped fluid condenses at ambient temperatures.

Collection can be redirected to process fluid by using separate pumping device.

The pressure transmitter in Piping Plan 75 will track the pressure in the vapor collection system.

In normal operation, the pressure in the containment seal chamber can be as high as the vapor collection system pressure plus the check valve cracking pressure (if present). Pressures greater than this may indicate excessive leakage past the inner seal.

Design Data & Covered items:
  • Max. Working pressure Vessel :40 BarG
  • Max. Working Temp.Instruments:80°C
  • Max. Working Temp. vessel: -20°C (+400°C)
  • Reservoir Volume : 23 Liters
  • Reflex level gauge
 
  • Level Switch High
  • Drain valve
  • Isolation valve
  • Pressure Switch High
  • Pressure Indicator
  • Flow Control Orifice.
Options & Accessories :
  • Pressure Transmitter
  • Differential Pressure Transmitter
  • Hydrostatic test
  • 100% Radiography test & Reports
  • Hardness Test
 
  • Positive Material Identification Test (PMI)
  • Ferrite Test (F number or F %)
  • Special Protective Painting
Configuration
Material of Construction SS316/L, As per client Req.
Welding Book (WPS, Weld map) ASME Sec. IX / EN 15614-1
Construction Code- Vessel ASME Sec. VIII Div. 1
Construction Code- Piping ASME B31.3
Provisional Certification as applicable CE marking (PED 2014/68/EU) ASME U Stamp API 682 Ed. 4th
Documentation
Pressure Part Certificates EN 10204 Type 3.1 / 3.2
Structure Part Certificates EN 10204 Type 3.1 / 2.1 / 2.2
Orientation & Sizes Dimension Reports
NDE Testing Reports VT,LPT, RT, PMI, Ferrite etc
Leak test Reports Hydro / Pneumatic Test Report
Surface Cleaning Certificate Pickling passivation
Surface Coating Certificate Painting Report